What is the difference between commissioning and validation




















Acceptance of this report by a multi-functional team including Engineering, Area Manager, Quality Assurance, and Quality Control releases lots for distribution, provides approval of the process, and deems the process ready for Stage 3 — Continued Process Verification.

Under stage 3, the organization is responsible to establish one or more systems that will monitor the manufacturing process to detect unplanned departures from the process. The data collected should include relevant process trends and quality of incoming materials or components, in-process material, and finished products.

The data should be statistically trended and reviewed by trained personnel. The information collected should verify that the quality attributes are being appropriately controlled throughout the process. Performance Validation has assisted large and small pharmaceutical manufactures in providing turn-key or staff augmentation support for commissioning, qualification, and validation projects.

For information on projects that we have successfully completed please see the Projects Summaries page of our website. Our goal is to provide our customers with peace of mind concerning their commissioning, qualification, and validation projects. ASTM International. E Standard guide for specification, design, and verification of pharmaceutical and biopharmaceutical manufacturing systems and equipment.

Quality risk management. Seeing those two definitions, I could certainly make a case that they are the same, but as any of you who know these two practices intimately, you already know there is huge difference between these two. They have a very important role, and they are going to make sure that you follow their pre-approved qualification procedures and in no way deviate from the qualification life cycle.

Many times, commissioning is performed by the system or equipment vendor using their own commissioning documentation that has been produced previously for similar type projects. When this is given to the quality authority for pre-approval, they will more likely return it to the vendor with suggested changes that make the commissioning document more of a qualification document. Many of these changes have nothing to do with the actual testing of the operation of the equipment or system which was the intent of the commissioning document to begin with.

He knows the problem right away and goes back in checks off all the boxes and alarm testing commissioning then proceeds. The primary goal of every project is to deliver safe and efficacious products to the patient. Therefore, it is imperative that the environmental control of the facility making that product function is at its optimal performance.

Maintaining environmental control of complex facilities and processes is significant and will require the integration of industrial automation products, for the process equipment, and building control systems such as HVAC and the environmental monitoring system. These systems will probably be sourced from multiple vendors, and will all have to interface and, in the end, verify that all direct inputs and outputs were within range and under control.

Maintaining environmental control of complex facilities and processes is significant and will require the integration of industrial automation products. Traceability is a hot topic in this field.

Therefore, each commissioning team is required to test traceability of all design specifications for all facilities, process equipment and software developed for the project. A well-defined VMP, as well as detailed project controls, can help address this. Designing a facility to fit a process is a challenge that many companies face.

An example of this would be a company who decides to renovate. The existing facility might not have an HVAC system that is optimal to support the process, creating issues with cross-contamination, improper airflow and circulation, air purity, etc. We are all eventually consumers of the products that we help to provide by serving and participating in this industry.

More than that, we have a significant opportunity to design, build and test facilities and products that will improve the lives of millions of people worldwide. Commissioning and qualification are critical steps in the pharmaceutical drug and biologic supply chain process.

With them, we can ensure that customers have access to the quality products that they need. This article is featured in the May issue of Cleanroom Technology. The digital edition is available online. Germfree bioproduction platform for startups on show at BIO Once design and construction and general commissioning are completed, pharmaceutical facilities must be qualified and their processes validated.

Validation is the generation of documented evidence that processes are capable of consistently producing finished product that meets quality specifications. Validation is typically divided into four qualification phases: design qualification DQ , installation qualification IQ , operational qualification OQ , and performance qualification PQ. Commissioning will be conducted here to ensure a correctly designed and built facility, with confirmation of water and power utility supply, HVAC systems, waste removal, etc.

As an example, consider purchasing an oven. DQ ensures you have adequate space, that it will be electric or gas, as specified, and that it will be equipped with the appropriate supply lines. IQ confirms you received the model you ordered and all its associated documentation. OQ confirms that if you set a temperature and time up to maximum specifications , the oven operates as it is supposed to, and PQ confirms that whatever you want to bake comes out as intended under the required settings.

In a pharmaceutical operation, the commissioning team builds and qualifies operation of the facility. The validation team confirms the facility is capable of consistently yielding product that meets its quality specifications. Take a deeper dive into the process in Joanna Gallant's course:. From a regulatory perspective, qualification is the responsibility of the end user.